Brief Installation Guide of Rubber Roll1. Subfloor The surface must be smooth, level (levelled) and clean/dry;
2. Preparation When rolling out the rubber rolls, they will curl up at the ends. We therefore recommend leaving the rolls at room temperature for a few hours (ideally 24) before final laying and cutting to allow the surface to acclimatise;
3. Glue to the Floor For complete surface adhesion and due to characteristic roll tensions, we recommend gluing the rubber to the substrate; |